Newsletter Sign-Up
Submit Your Email:
Testimonials
DRC and the SPIDR well testing system have been a great tool in the evaluation process of the wells I look over. They have been very dependable and accessible for the many years that I have been using them. I have been using ...
- Timothy H. Bertsch

Drawdown

Drawdown testing will provide the same reservoir data as the build-up test and is run by producing the well at a constant rate after an extended shut-in period.

An extended drawdown test can be used to identify reservoir boundaries and geometry. Extended drawdown tests allow a reservoir model to be created , tested, and modified until it matches the actual performance of the reservoir.

Drawdown tests require control and monitoring of flow rates. Continuous access to SPIDR memory during the test period and the economics of SPIDR use make it ideal for this application. The installation for drawdown testing is shown to the left.

 

Home  About DRC  The SPIDR  Analysis Tools  Literature  Contact Us  News  Careers 

Site Map  Disclaimer 

DRC - Data Retrieval Corporation

13231 Champions Forest Drive, Suite 401,
Houston, TX 77069
Phone 281-444-5398 • Fax 281-444-5397

Questions, comments or suggestions? Contact Us
(c) 2010 DRC - Data Retrieval Corporation

Site Admin

Site by Paradigm Web Design

Site Ensemble CMS Copyright © 2010 Paradigm New Media, LLC. All rights reserved.