Installation FAQs

Back to FAQs

Frequently Asked Questions
No. Installing the SPIDR on a well is very simple and takes about 5 minutes using an adjustable wrench.
The SPIDR will wake up and start recording at a preprogrammed date and time, once its installed it requires no maintenance or service. You can, if you wish, communicate with the SPIDR using our free software to monitor the progress of your test.
Yes, included in the box is a detailed schematic showing how to connect the SPIDR, you can also download the instructions on installing the SPIDR here: SPIDR Installation Sheet
DRC includes a 2oz bottle of 'SNOOP' for detecting leaks around joints, a leak will show up as 'bubbling'. If you are conducting a build up test, check for leaks again after the well has been shut in.
If the transducer was supplied by DRC as part of the rental, simply install the external transducer in the appropriate place on the well and connect the cable to the connector marked 'channel 1' on the SPIDR. The SPIDR will have been preprogrammed with the transducer details and no additional programming or maintenance is required.
The SPIDR is not position sensitive and it can be mounted in any convenient location. Try to avoid flow lines as a mounting site if they are hot or resonate.
 
Name:
Email:
Phone:
Question & Comments:
 


 
Home  About DRC  Services  Resources  News  Contact Us 

Site Map  Disclaimer 

DRC - Data Retrieval Corporation | 13231 Champion Forest Drive, Suite 401 | Houston, TX 77069 | Phone (281) 444-5398, Fax (281) 444-5397

© 2013 DRC - Data Retrieval Corporation | Admin | Site by Paradigm

Site Ensemble CMS Copyright © 2013 Paradigm New Media, LLC. All rights reserved.